Boiler

Boiler Replacement

Brighton

Project Details

Duration
15 days
Project Value
Between £120 000 and £140 000
Engineers
5
Scope of Work
Boiler Replacement

About This Project

Replacing two ageing boilers in a live building is never straightforward, and this project was no exception. The work had to be staged carefully to keep central heating running at all times - losing heat entirely was not an option. The old boilers each weighed close to 1,000 kg. With no access for lifting equipment, both had to be broken down into sections and manually carried down the stairs. New, energy-efficient systems were installed in their place. The result is improved performance, lower running costs, and a much simpler setup to maintain.

Project Photos

Project photo 1
Project photo 3
Project photo 5
Project photo 7
Project photo 9
Project photo 11
Project photo 13
Project photo 15
Project photo 2
Project photo 4
Project photo 6
Project photo 8
Project photo 10
Project photo 12
Project photo 14
Project photo 16