Being a mandatory legal requirement in order to have buildings insurance, it is something we come across very often and deal with ease. This job started with the removal of all refrigerant into approved cylinders, followed by the subsequent removal and replacement of safety relief valves on the low pressure and high pressure pipes. Finally, all refrigerant was re-instated back into the system after the unit had passed pressure leak tests.
- Location of project:
- Duration of project:
- Value of project:
- Number of Engineers:
- Scope:
- Swindon
- 2 days
- Between £2 000 and £4 000
- 2
- Replacement of safety pressure relief valves