All iron pipework had to be removed and replaced with pvc ranging from 3/4 to 8 inch. A very demanding job as lots of planning and organization was needed. Being an air force base there were many requirements and deadlines to meet and we managed to complete the job in time and with out a hitch.
- Location of project:
- Duration of project:
- Value of project:
- Number of Engineers:
- Scope:
- Suffolk
- 1 week
- Between £12 000 and £16 000
- 4
- Pipe replacement at an air force base